A green backup job proves that data was copied. It does not prove that you can restore it, that the restore is complete, or that it fits inside your RTO. CISA's guidance is to "regularly test the availability and integrity of backups in a disaster recovery scenario" (CISA).
Datto describes six testing methods that range from cheap to thorough (Datto):
- Plan review. Stakeholders read the written plan to find missing steps and outdated contacts.
- Tabletop exercise. The team talks through a disaster scenario to clarify roles and decisions.
- Simulation testing. A controlled scenario, such as a network failure, with real recovery actions and measured response times.
- Partial testing. Restoring one component, such as a key database, without a full exercise.
- Full-scale testing. Running the whole plan, possibly including failover to backup infrastructure.
- Parallel testing. Restoring critical systems in a separate environment while production keeps running, then comparing the result with live data.
For most startups, partial and parallel tests give the most value for the effort: restore last night's database into an isolated environment, run a few checks against it, and time the whole process. Cloud providers increasingly automate this. AWS Backup, for example, offers restore testing that runs on a schedule, restores specific or random recovery points and reports the results (AWS).
On frequency, Datto's rule of thumb is to test the plan at least once a year, after any significant infrastructure change, and more often, such as quarterly or twice a year, for critical or regulated systems (Datto). Automated restore checks for the production database can run far more often than that, which is how you reach the "zero recovery errors" in Veeam's extended rule.
Record each test: what was restored, from which point in time, how long it took, what failed and what you changed. Compare the measured times with your RTO and RPO. If a restore takes six hours and your target is two, you have found the most important item on your roadmap.