A dependency pull request usually shows you a version string and a lockfile hunk. That is the least informative part of the review. Open the release notes first, because they tell you whether this bump changes behavior, drops support, or fixes a vulnerability you actually care about.
Read the changelog in three passes. First, scan for the words that signal a break: "removed," "renamed," "deprecated," "no longer," "behavior change," and any note about minimum runtime or peer versions. Second, look for the security fix line. If the release closes a vulnerability, note the advisory identifier so you can confirm later that your deployed code really contains the fixed version. Third, check the release date and the span of changes. A bump across two patch releases is a different review from a bump across two major versions, and you should budget your time accordingly.
The reason this matters is structural. Most applications pull in far more third-party code than first-party code, and a single package can drag in many more beneath it. The UK National Cyber Security Centre points out that ecosystems such as Node.js, Rust, and Python lean heavily on external registries and that a single dependency can introduce a large number of transitive dependencies, so the changelog you read is only one of several that changed in the NCSC guidance on checking dependencies. When you cannot find release notes for a transitive package that moved, that is a finding in itself.
A worked example makes the time budget concrete. Suppose a pull request bumps one direct library and the lockfile shows four transitive packages also changed. You now have five changelogs to read, not one. At two minutes each that is ten minutes of reading, which is cheaper than a single afternoon debugging a behavior change in staging. Make the transitive count visible in the pull request description so the reviewer knows the real scope before opening anything.



