You built the precedence loop. It detects when two sources disagree, picks a winner, records why, and moves on. That work is done. The question that remains is a spending question, not an engineering one: which of these automated precedence calls earns a human review minute?
Most teams answer it with a flat confidence cutoff. Below 0.8, send to review. That number is a guess, and it treats a wrong call on a product description the same as a wrong call on a payment routing rule. The two have wildly different costs. A useful threshold is denominated in dollars, not probability, because dollars are the only unit that lets you compare a rule's risk against a person's time.
The rule is short. Let p be the probability the automated precedence call is wrong. Let C be the cost when it is wrong. Let R be the loaded cost of one review minute. Send the conflict to a human when p times C is greater than R. Everything else stays in the loop.
That formula is the whole article. The rest is how to get honest numbers for p, C and R, and how to defend the result when someone asks why their queue got shorter.